Location/Work Areas:
- Route 202 (DeKalb Pike)),from Swedesford Road to Route 309 (Bethlehem Pike), Upper Gwynedd, Lower Gwynedd and Montgomery townships
- Route 63 (Welsh Road), Bell Run Blvd. (west of DeKalb Pike) to Stump Road, Upper Gwynedd, Lower Gwynedd and Montgomery townships
- Route 202 Parkway extension, from Route 202 (DeKalb Pike) to Route 63 (Welsh Road), Upper Gwynedd and Lower Gwynedd townships
Features:
- Reconstruct and widen the existing two lane section of Route 202 (DeKalb Pike) on existing alignment south of Route 63 (Welsh Road) to five lanes, two northbound and two southbound with a center turn lane
- Mill and overlay existing five lane section of Route 202 (DeKalb Pike) on existing alignment north of Route 63 (Welsh Road) from Knapp Road to Route 309.
- Widen Route 63 (Welsh Road) to four lanes, two eastbound and two westbound with a center turn lane at Route 202 (DeKalb Pike) and Route 202 Parkway intersections
- Construct a 700-foot long Route 202 Parkway extension from Route 202 (DeKalb Pike) to Route 63 (Welsh Road)
- Four lanes, two northbound, two southbound
- Five-foot wide paved bicycle lanes each direction
- Construct signalized intersection with turn lanes at
- Route 202 (DeKalb Pike) and Route 202 Parkway
- Route 202 Parkway and Route 63 (Welsh Road)
- Install Sound Barrier Walls along
- Route 202 (DeKalb Pike) Northbound; from 600 feet south of Hancock Road to Route 202 Parkway extension
- Route 202 Parkway extension Northbound from Route 202 (DeKalb Pike) to Route 63 (Welsh Road)
- Route 202 (DeKalb Pike) Southbound from Hancock Road south approximately 700-feet
Route 202 Parkway Access
- Route 202 (DeKalb Pike) at Route 202 Parkway extension
- Route 63 (Welsh Road)
Construction Information
- Bid Price: $17,762,061
- Contractor: Road Con Inc., West Chester, PA
- Start Work: Spring 2010
- Completion: Spring 2012
|