Section 721 Construction Progress Photos
 
 
Section 721 - August 2012
-
The landscaper adds some soil to a berm near Bristol Road.
-
A worker clears the finished pavement in Section 721.
Section 721 - July 2012
-
A finished section of Parkway north of Pickertown Road.
-
Split rail fence separating the Parkway from the shared use path in Section 721.
-
Pre-oxidized guiderail in place along a finished section of Parkway north of Almshouse Road.
-
A stretch of Parkway Section 721 where the shared use path diverts behind berms.
Section 721 - May 2012
-
The trail head parking area at New Britain Road, nearly completed.
-
Newly installed signs point to the completion this fall of the Route 202 Parkway.
-
Finished area of Parkway Section 721 in Bucks County.
-
Newly installed signs point to the completion this fall of the Route 202 Parkway.
-
Finished area of Parkway Section 721 in Bucks County.
-
Finished area of Parkway Section 721 in Bucks County.
-
Split rail fence separating the travel lanes from the multi-use path under construction in Section 721.
-
Trees, some in place and some ready for planting, in Section 721.
-
Trees, some in place and some ready for planting, in Section 721.
-
Trees, some in place and some ready for planting, in Section 721.
Section 721 - March 2012
-
Workers construct a permanent drainage basin near Lower State Road.
-
A cul-de-sac on Vale View Drive is graded.
-
A new bike path constructed along Wells Road.
Section 721 - December 2011
-
Workers pave the shared use path at a bridge approach in Section 721.
-
Shoulder excavation and grading in Section 721.
Section 721 - November 2011
-
Workers install protective barrier between the Parkway and the Shared-Use Path at Wells Road.
-
Concrete is poured for a bridge parapet in Section 721.
-
The Parkway's stone sub-base is placed and compacted near the Wells Road overpass.
-
Paving in place just north of Pickertown Road
-
The Parkway curves around a small bridge north of Pickertown Road
-
The intersection with Bristol Road, which is being widened at the Parkway
-
The Parkway bridge over the Neshaminy Creek
-
A bermed section of the Parkway
-
A rolling section of Parkway approaching Almshouse Road
-
Looking north toward Lower State Road
-
The Wells Road overpass
-
The northern terminus, fanning out at ramps at the interchange with the Route 611 Bypass
-
Trail Head Parking Lot at New Britain Road
Section 721 - October 2011
-
Paving near the interchange with Route 611.
-
Spreading and rolling sub-base stone for the Parkway near Lower State Road.
-
Setting the "form liners" for a side wall on the Parkway bridge over the Neshaminy Creek: Note the decorative pattern on the inside of the liners that will produce the look of stone work on the poured concrete.
-
A paving operation at a trail head parking lot at New Britain Road.
Section 721 - September 2011
-
A recently poured section of concrete deck for the Parkway bridge over the Neshaminy Creek cures.
-
Residents sneak an after-hours peek at the progress of the Wells Road overpass.
-
A decorative abutment wall at the Wells Road overpass.
-
Parapet construction at the approaches to a Parkway bridge between Lower State and Wells roads.
-
Intersection widening on Upper State Road at Bristol Road will add turning lanes to accommodate traffic to and from the Parkway.
-
The top side of a Parkway drainage culvert in Section 721.
-
Parapet construction on the Parkway bridge over the Neshaminy Creek.
Section 721 - August 2011
-
Fresh paving is placed for the Parkway and the Multi-Use Path near Bristol Road.
-
Deck paving is set to begin on the Parkway bridge over the Neshaminy Creek.
-
The recently poured concrete deck for Wells Road overpass is cooled as it cures.
-
The pavement sub-base is prepared north of Wells Road.
Section 721 - June 2011
-
A retaining wall and bridge under construction near Wells Road.
-
The Parkway's sub-base between Lower State and Almshouse roads is compacted.
-
The Parkway's base grade is established near Wells Road.
-
Workers pour curbing at Upper State and Bristol roads.
-
Construction continues on the Wells Road overpass.
-
A retaining wall under construction in Section 721.
Section 721 - May 2011
-
With beams in place, workers begin preparations to build the deck for the Parkway bridge over the Neshaminy Creek.
-
Reinforcing steel roads protrude from the partially completed southern abutment for the bridge over the Neshaminy Creek.
-
Rocks protect the piers for the Parkway bridge from "scouring" by the constant current of the Neshaminy Creek.
-
Ramp construction at 611 Interchange.
-
Construction of Parkway bridge over New Britain Road.
-
Sub-base stone for the Parkway's main line is compacted.
-
Deck construction is under way on the Parkway bridge over the Neshaminy Creek.
-
A worker compacts stone for a culvert footer.
-
A carpenter builds formwork between the massive beams on the bridge over the Neshaminy Creek.
Section 721 - April 2011
A big rig carries a big beam through Doylestown.
-
Beams for the Neshaminy Creek Bridge are moved through Doylestown Borough.
-
Beams for the Neshaminy Creek Bridge are moved through Doylestown Borough.
-
Beams for the Neshaminy Creek Bridge are moved through Doylestown Borough.
-
Beams for the Neshaminy Creek Bridge are moved through Doylestown Borough.
-
Beams for the Neshaminy Creek Bridge are moved through Doylestown Borough.
Section 721 - March 2011
-
Workers build abutment walls for the Wells Road bridge over the Parkway.
-
A Parkway bridge over a branch of the Neshaminy Creek.
-
A retaining wall under construction near Wells Road.
-
Workers placing a "leveling pad" for a retaining wall in Section 721.
-
Two piers completed and one nearly so for the bridge over the Neshaminy Creek.
Section 721 - February 2011
-
Excavation is underway for the eastern abutment of the Parkway bridge over Wells Road.
-
Carpenters build forms for a retaining wall.
-
The western abutment for the Parkway bridge over Wells Road is taking shape.
-
A utility trench is cut along Upper State Road near Limekiln Pike.
Section 721 - January 2011
-
A crew continues mid-winter excavation near Wells Road.
-
Pier construction for bridge over Neshaminy Creek.
-
Pier excavation for the bridge over Neshaminy Creek.
Section 721 - December 2010
-
A partially-completed stream crossing in Section 721.
-
This long view shows the path of the Parkway winding through the woods in Section 721.
-
Drainage work continues on Upper State Road near Bristol Road.
-
Pilot holes are drilled as part of the operation to blast bedrock at the Wells Road overpass site.
Section 721 - November 2010
-
Blasted rock is removed at Wells Road.
-
Workers move material on a widened section of Bristol Road.
Section 721 - October 2010
-
Loosened rock is excavated near Wells Road.
-
Workers pour concrete for an abutment at the bridge over the Neshaminy Creek.
-
Excavation for drainage near Bristol Road.
-
Workers prepare for a controlled blast to loosen bedrock along the Parkway near Wells Road.
-
Blasted rock is removed near Wells Road.
-
Bristol Road is widened near Upper State Road.
Section 721 - September 2010
-
Sewer line construction takes place in Section 721.
-
Workers complete installation of reinforcing steel in advance of paving on the bridge over New Britain Road.
-
Blasted rock is excavated north of Bristol Road.
Section 721 - August 2010
-
Formwork is built for the foundation of a drainage structure near Almshouse Road.
-
Heavy equipment is used to strip topsoil south of Lower State Road.
-
Workers build "wing walls" for a bridge over Almshouse Road.
-
A crew sets a precast arch culvert near Almshouse Road.
-
Looking through a precast arch culvert near Almshouse Road.
-
Beams are set for the Parkway bridge over Almshouse Road.
-
Workers install shoring to support the embankment during construction of a small bridge near Wells Road.
Section 721 - July 2010
-
The western abutment for the Parkway bridge over Almshouse Road nears completion.
-
Deck beams have been set for the Parkway bridge over New Britain Road.
-
The stone finish on the Parkway structure over New Britian Road is stained.
-
A view of the Parkway overpass taken from New Britian Road looking west.
-
Looking south towards Wells Road, the Parkway starts to take shape.
Section 721 - June 2010
-
A steel re-bar cage is built atop the foundation for the Parkway bridge over Almshouse Road.
-
An equipment operator shapes a storm water management basin for Section 721.
-
Bulk Excavation is underway for the Parkway near Bristol Road.
-
A roller is used to compact a newly excavated embankment near New Britain Road.
-
A crew installs a sanitary sewer along Bristol Road.
Section 721 - May 2010
-
A crew relocates utility lines along Coachlight Circle.
-
A drainage trench is excavated on Section 721.
-
Foundations are dug for a Parkway bridge over Almshouse Road.
-
The footer for an abutment for the Parkway Bridge over Almshouse Road is under construction.
-
Workers construct an abutment "wing wall" for the structure over New Britain Road.
-
The south side of Bristol Road is cleared of vegetation.
Section 721 - April 2010
-
Workers utilize video to inspect a relocated storm sewer on Section 721.
-
Temporary shoring is driven to support excavation for a bridge abutment at the Almshouse Road bridge.
-
Clearing operations are underway on Section 721 near Lower State Road.
Section 721 - March 2010
-
Photo 1: With a foundation in place, crews will begin forming an abutment wall for the bridge over New Britain Road in Section 721.
-
Photo 2: Meanwhile, construction of the second abutment is underway for the New Britain Road Bridge.
-
Photo 3: Workers excavate a drainage channel on Section 721 between Wells and New Britain Road.
-
Photo 4: Abutment construction continues on the bridge over New Britain Road.
Section 721 - February 2010
-
Photo 1: Site clearing is underway between Wells and New Britain Road.
-
Photo 2: A drainage channel is excavated near Wells Road.
Section 721 - January 2010
-
Photo 1: Stakes marking the center line of the Parkway are being put in place across the entire Section 721 area, much like these in the ground near Almshouse Road. Full construction on the section is expected to get underway in late winter or early spring
-
Photo 2: A worker installs environmental controls as part of the early-stage construction on Section 721.
-
Photo 3: Clearing is underway for Section 721 near Lower State Road.
   
Header

    Header   Project News
    Header   FAQ
   
    Header  Related Sites

    Header  Subscribe for E -Mail
   
    511pa

    Header Twitter
Footer