Project Overview:
Improvements to County Line Road in the vicinity of the Route 202 Parkway will be completed under two separate contracts. Under the first (WD1), 2.1 miles of County Line Road will be widened from 2-3 lanes to 5 lanes with 5-foot shoulders between US Route 202 (Doylestown Road) and Stump Road.
The second stage (WD2) will widen 1.5 miles of County Line Road from 2 lanes to 5 lanes with 5-foot shoulders between Stump Road and Route 152/Limekiln Pike, and from 2 lanes to 3 lanes from Route 152/Limekiln Pike to Lower State Road/Kulp Road. WD2 also includes significant improvements to the County Line Road/Limekiln Pike/Lower State Road intersection.
Project Location:
- WD1: County Line Road, Route 202 to Stump Road
- New Britain, Warrington and Montgomery townships.
- WD2: County Line Road, Stump Road to Lower State Road/Kulp Road; Horsham, Warrington and Montgomery townships
Project Details:
WD1
- 2.1 miles long
- New traffic signals at
- Route 202 Parkway
- Summer Ridge/Horizon Drive
- New sidewalks throughout
- Noise Walls
WD2
- 1.5 miles long
- Intersection Improvements
- Lower State/Route 152/Limekiln Pike/County Line Road
- New sidewalks throughout
- Noise Walls
Construction Traffic Impacts:
- Maintain one lane of traffic in each direction at all times.
Planned Detours:
Schedule:
WD1
- Begin Construction: Fall 2010
- Finish Construction: Mid-2012
WD2
- Begin Construction: TBD
- Finish Construction: TBD
Construction Cost:
WD1
- $14 million (est.)
- Construction Funding: 100% State
WD2
- $12.5 million (est.)
- Construction Funding: 15% State, 80% Federal, 5%Local
Engineering Design:
WD1
- McCormick Taylor Assoc., Philadelphia
WD2
- McCormick Taylor Assoc., Philadelphia
Contractor:
WD1
WD2
Construction Management
WD1 & WD2:
- DCK Corporation, Montgomeryville, PA
|